Return to Storage Tanks
|
Go to DC DOEE
Underground Storage Tank Database
Program Metrics
Find Facilities
Find Contractor
Exams
View Reports
EXXON S/S #2-5377 (5000360)
>
LUST Cases
>
LUST Case#95057
>
Event Tasks
>
LUST Notice of Violation (NOV) (7/28/2016)
Edit LUST Notice of Violation (NOV)
Task Type
Temp Closure Expiration
LUST Event Notification
LUST Directive
Comprehensive Site Assessment (CSA)
Corrective Action Plan (CAP)
CAP Approval
On-site Inspection
LUST Notice of Violation (NOV)
LUST Notice of Infraction (NOI)
Monitoring Reports
DCRBCA
Follow-up Inspection
Closure Report
Cost Recovery
Workplan
Other Event
NFA Letter
On-site Inspection
Inspection Directive
Compliance Directive
Follow-up Inspection
Delivery Prohibition
NOV
NOI
Final Report
Installation Notification
Installation Site Directive
Installation Permit
Phase 1 Installation Inspection
Phase 2 Installation Inspection
Phase 3 Installation Inspection
Office Directive
Reinspection
NOI
Final Report
Closure Notification
Upgrade/Repair Notification
Tank Closure-In-Place Site Directive
Tank Removal Site Directive
Upgrade/Repair Site Directive
Removal Permit
Removal Inspection
Abandonment Permit
Upgrade/Repair Permit
Abandonment Inspection
On-site Inspection
Office Directive
Office Directive
Reinspection
Reinspection Inspection
NOV
NOV
NOI
NOI
Final Report
Tank Closure Report
Installation-UST Permit
Installation-MWs Permit
Installation-SVE Permit
Abandonment Permit
Assessment Permit
Removal Permit
Removal & Installation-UST Permit
Removal & Installation-MWs Permit
Removal & Assessment Permit
Removal & Boring Permit
Removal & Upgrade Permit
Boring Permit
Boring & Abamdonment Permit
Boring & Installation-UST Permit
Boring & Installation-MWs Permit
Dewatering Permit
Excavation Permit
Remediation Permit
Repair-UST/Pipes Permit
Repair-SUMPs Permit
Upgrade Permit
Testing Permit
Boring Permit
Monitoring Well Permit
Other Permit
Assessment Notification
Closure-in-Place Notification
Emergency Notification
Excavation Notification
Investigation Notification
Leak Detection Notification
Remediation Notification
Repairs Notification
Soil Boring Notification
Testing Notification
Upgrade Notification
UST Installation Notification
UST Removal Notification
Well Installation Notification
Well Abandonment Notification
Other Notification
Directive
Directive
Site Directive
Site Directive
Approval Letter
Approval Letter
Closure Letter
Closure Letter
NFA Letter
NFA Letter
Other Directive
Other Directive
Abandonment
Abandonment-LUST
Abandonment-Reinspection
Assessment
Assessment-LUST
Assessment-LUST-Reinspection
Compliance
Compliance-LUST
Compliance-Reinspection
Emergency
Emergency-LUST
Excavation
Excavation-LUST
Installation
Installation-LUST
Installation-LUST-Reinspection
Installation-Reinspection
Investigation
Investigation-LUST
Leak Detection
Lust Activity
Lust Activity-Reinspection
Other
Repairs
SOC Inspection
SOC Inspection-Reinspection
Upgrade
UST Removal
UST Removal-LUST
UST Removal-LUST-Reinspection
UST Removal-Reinspection
Other Inspection
Historical FEMS Document(s)
Historical LUST Document(s)
Historical SOC Document(s)
Historical UST Document(s)
Inbound Correspondence
Outbound Correspondence
Enforcement Date
Required
Invalid Date
Enforcement Number
Other Task Description
Task Owner
Comment
Too long. Exceeding 2000 characters
Due Date
Invalid Date
Extended Due Date
Received/Closed Date
Download Draft Letter
Documents
Generate/Add Letter
Download User Template
Document Type
Subject
Document Date
Public
Correspondence Out
07/28/2016
True
Add Document
Document Type
CAP Report
Closure Directive
Closure Report
Correspondence In
Correspondence Out
CP Records
CSA Report
Directive
EISA Application
Financial Responsibility Documents
General Correspondence
General Enforcement
General Report
General VRAP
Imported Historical File
Inspection Evaluation Report
Inspection Report
Install Inspection Report
Invoice
LD Records
Line Tightness Test Results
LUST Case Closure
LUST Work Plan
On-site Photo
Other
Phase 1 and Phase 2 Report
Scanned Historical File
Signature
Site Diagram
Site Monitoring Report
Tank Tightness Test Result
Temporary Closure Request
Uncategorized
Upgrade and Repair Report
UST Notification Form
VRAP Application
Well Sample Results
Document Date
Public
Subject
Choose Document
Choose Violations
Violations To Include:
Submit CAP (before Oct 21)